19 DECEMBER 2012
As our
session is in afternoon reached campus by 1pm and had lunch first.. They are
punctual today and our first class Business skills was started today. Our LG(Learning Group.. we all will be trained on .net)
has 32 members with 19 non CS students. 2 ppl are grouped together and each
given a topic.. Twist is that one should not tell of his topis but the topic of
other person in the group. It was said that 2 ppl vl b batched from next day.
Unlike other campus there is no CC Camera surveillance here. After 3 hours of
business session a break of 45 mins was given (another break for 10mins was
given between). Then started our Proj Delivery session.. It’s the session where
we came to know about diff stages of our training.. what we are going to do and
how they are going to assess us and so on.. It was for about an hour.. Then a
break for 10 mins and started the System Induction session.. we are given
Ultimax login ID’s and pwd and logged into site.. filled necessary details and
ended up the session by 9:20.. though it was scheduled till 9. Then started our
real problems.. Line for food coupon and for taking food was so heavy that by
the time our turn came everything was finished..
we were to go outside and have our food.. ppl park is in such a area that we
cant get anything after 9.
Got dosa in nearby hotel and we missed the bus L
got into another bus and we were forced to walk a km to reach hostel by 11pm..
No comments:
Post a Comment